It’s been a couple of months since construction started on the observatory structure itself and I’ve made excellent progress. The observatory is dried-in and the siding is halfway completed. It’s really turning into a nice looking building. With the rain forecast this weekend I expect to be working on installing the drive system for the roll-off and doing whatever other interior electrical work I have time for.
-
Recent Posts
Latest Images
Latest Products
NexStar 8se Hand Control Holder
$40.00$40.00Select options This product has multiple variants. The options may be chosen on the product page
ORO Logo Unisex T-Shirt
$25.00$25.00Select options This product has multiple variants. The options may be chosen on the product page
“Whirlpool Moon” Photo Paper Poster
$60.00 – $100.00$60.00 – $100.00Select options This product has multiple variants. The options may be chosen on the product page
2017 Total Solar Eclipse Poster
$20.00 – $35.00$20.00 – $35.00Select options This product has multiple variants. The options may be chosen on the product page
Recent Comments
Archives
Categories
Meta